The City of Annapolis revealed its highly anticipated design for a new City Dock Welcome Center Sept. 20, a project aimed at protecting the downtown area from frequent flooding. nThe proposed design was presented to the City Dock Action Committee to get feedback on the plans. The Welcome Center — which will cost about $59 million — would replace the current harbormaster’s office with a new two-story building that will consolidate many of the existing properties including the recently acquired Burtis House near the waterfront on Prince George’s Street.
‘We’ve got to get it right’: City of Annapolis unveils $88 million City Dock revitalization project design
October 3, 2023